top of page
Commercial & Industrial
Remediation of Sea Container
​
Details
The project consisted of a 20ft container requiring protective coatings.
​
The scope included:
-
Abrasive blasting of steel
-
Application of zinc rich primer
-
intermediate coats of Durebild STE
-
Topcoat in polyurethane Weathermax HBR
Steel Frame Structure & Handrailings
​
Details
The project consisted of a specialised fabricated lifting frame.
​
The scope included:
-
Abrasive blasting of steel
-
First and intermediate coats of Durepon FRX
-
Topcoat in high gloss epoxy Duremax HBE
Goldfields Gas Pipeline Extension Works
​
Details
The Goldfields Gas Pipeline is a 1,378-kilometre transmission pipeline that extends from Yarraloola, in the Pilbara region of Western Australia, to Kalgoorlie, in the Goldfields-Esperance region. The client required the pipeline to blend into the existing pipeworks.
​
The scope included:
-
Power tool cleaning of steel
-
Application of International interzinc 52 zinc rich primer
-
intermediate coats of International Intercure 420 epoxy MIO
-
Topcoat in International Interfine 629
Strata Complex Maintenance
​
Details
The project consisted of a multi-story strata complex requiring external remediation.
​
The scope included:
-
High pressure water blasting
-
Application of Granoprime sealer
-
Topcoat in Elastomeric acrylic Granoskin membrane
-
Timber handrails and exterior wood work application in Intergrain DWD
Warehouse Floor Maintenance
​
Details
The project consisted of a 300sqm concrete floor.
​
The scope included:
-
High pressure water blasting
-
Penetrating coat of PPG EXH20
-
Topcoat in PPG EXH20
Protective Coatings of Offshore Equipment
​
Details
The project consisted of a 20ft long workbench and 20ft long storage rack requiring protective coatings.
​
The scope included:
-
Abrasive blasting of steel
-
Application of Zincanode 402 zinc rich primer
-
intermediate coats of Durebild STE
-
Topcoat in polyurethane Weathermax HBR
.