top of page

Commercial & Industrial

Remediation of Sea Container
​
Details
The project consisted of a 20ft container requiring protective coatings.
​
The scope included:
  • Abrasive blasting of steel
  • Application of zinc rich primer
  • intermediate coats of Durebild STE
  • Topcoat in polyurethane Weathermax HBR
Steel Frame Structure & Handrailings
​
Details
The project consisted of a specialised fabricated lifting frame.
​
The scope included:
  • Abrasive blasting of steel
  • First and intermediate coats of Durepon FRX
  • Topcoat in high gloss epoxy Duremax HBE
Goldfields Gas Pipeline Extension Works
​
Details
The Goldfields Gas Pipeline is a 1,378-kilometre transmission pipeline that extends from Yarraloola, in the Pilbara region of Western Australia, to Kalgoorlie, in the Goldfields-Esperance region. The client required the pipeline to blend into the existing pipeworks.
​
The scope included:
  • Power tool cleaning of steel
  • Application of International interzinc 52 zinc rich primer
  • intermediate coats of International Intercure 420 epoxy MIO
  • Topcoat in International Interfine 629 
Strata Complex Maintenance
​
Details
The project consisted of a multi-story strata complex requiring external remediation.
​
The scope included:
  • High pressure water blasting
  • Application of Granoprime sealer
  • Topcoat in Elastomeric acrylic Granoskin membrane
  • Timber handrails and exterior wood work application in Intergrain DWD 
Warehouse Floor Maintenance
​
Details
The project consisted of a 300sqm concrete floor.
​
The scope included:
  • High pressure water blasting
  • Penetrating coat of PPG EXH20
  • Topcoat in PPG EXH20
Protective Coatings of Offshore Equipment
​
Details
The project consisted of a 20ft long workbench and 20ft long storage rack requiring protective coatings.
​
The scope included:
  • Abrasive blasting of steel
  • Application of Zincanode 402 zinc rich primer
  • intermediate coats of Durebild STE
  • Topcoat in polyurethane Weathermax HBR

.

bottom of page